ISO 13485 manufacturing · CE MDR & FDA 510(k) documentation on file
Quality & compliance

The paperwork is the product.

An oximeter is easy to assemble and hard to document. This page is what your importer, notified body or marketplace compliance team will ask for — and where each document comes from.

The quality system

ISO 13485 since 2016, audited annually.

Design control, purchasing, production, calibration and servicing all sit inside one quality management system. The certificate covers the Zibo site; the scope statement is available with the pack.

  • 01Design controlISO 13485 §7.3
  • 02Risk managementISO 14971
  • 03Software lifecycleIEC 62304 · Class B
  • 04UsabilityIEC 62366-1
  • 05Post-market surveillanceMDR Annex III
Certificate
Quality Management System
ISO 13485:2016Valid
ISO
13485
Quality systemDesign, production & servicing
CE
MDR
EU 2017/745Class IIa · technical file
FDA
510k
US marketDocumentation on request
IEC
60601
Electrical safetyTest reports per model
Read this before printing claims: certification applies to specific model configurations and markets. A CE mark on the OX-200 does not automatically extend to a custom housing with different materials. We confirm the applicable scope in writing before you print packaging.
Testing

What we test, how often, and what you get.

Two different things matter: every unit is verified, and every design is validated. The table separates the two.

Verification and validation programme
TestBasisFrequencyEvidence supplied
Optical calibrationIn-house SOP, certified simulator100% of unitsCalibration record per serial
24-hour drift checkIn-house SOP100% of unitsDrift log per lot
Functional / ATPIn-house test procedure100% of unitsTest record per serial
Drop testIEC 60068-2-31, ISTA 1APer lot sampleTest report
Electrical safetyIEC 60601-1Per modelThird-party test report
EMCIEC 60601-1-2Per model, annual reviewThird-party test report
SpO₂ performanceISO 80601-2-61Per modelPerformance test report
BiocompatibilityISO 10993-5 / -10Per material changeAssessment report
SoftwareIEC 62304, Class BPer releaseV&V file
Shelf lifeASTM F1980 acceleratedPer modelStability report

In-house records are available on request; third-party reports are shared under NDA. We do not publish full technical files on the open web.

Market access

What it takes to list in your market.

Indicative routes for a Class IIa / Class II oximeter. Timelines run from a complete technical file, not from a purchase order — and they depend on the notified body or local agent, not on us.

Regulatory route by market
MarketRouteWhat we supplyTypical timeline
EU / EEACE MDR 2017/745, Class IIaTechnical file, DoC, EUDAMED data, IFU6–9 months (notified body)
United StatesFDA 510(k)510(k) summary, predicate comparison, labelling3–6 months
United KingdomUKCA / MHRA registrationTechnical file, DoC, UK responsible person details3–6 months
BrazilANVISA registrationTechnical file, INMETRO evidence where applicable6–12 months
Saudi ArabiaSFDA MDMATechnical file, Arabic labelling, GHTF summary3–6 months
JapanPMDA, Class IITechnical file, DIC, Japanese IFU6–9 months
AustraliaTGA, Class IIaTechnical file, sponsor details, ARTG application3–5 months
We are a manufacturer, not a regulatory consultant. For market entry we work alongside your notified body or local agent and supply the technical evidence they need — we do not act as your legal representative.
Manufacturing

Traceability from photodiode batch to shipping carton.

Every unit carries a serial number tied to its calibration record, its lot and the component batches used. If a batch issue appears in the field, we can scope it in hours, not weeks.

4,200m²
Zibo facility
2lines
SMT + final assembly
500k
Units annual capacity
0.31%
12-month field failure rate

Incoming inspection

Optical components are inspected on arrival for wavelength and output consistency. Rejected batches are returned, not re-graded.

In-process control

Each assembly station has a defined check and a signed traveller. Units cannot move to the next station without it.

Final release

Calibration, functional test and a 24-hour drift check, followed by AQL 1.0 sampling on the finished lot and a certificate of analysis.

After shipment

Field returns are logged, analysed and reported quarterly with root-cause notes and corrective actions for contracted partners.

Documentation request

Ask for the pack your auditor will ask for.

Tell us the market and the model. We will send the applicable certificates, test reports and declarations under NDA — usually within one business day.

Chat with sales