The paperwork is the product.
An oximeter is easy to assemble and hard to document. This page is what your importer, notified body or marketplace compliance team will ask for — and where each document comes from.
ISO 13485 since 2016, audited annually.
Design control, purchasing, production, calibration and servicing all sit inside one quality management system. The certificate covers the Zibo site; the scope statement is available with the pack.
- 01Design controlISO 13485 §7.3
- 02Risk managementISO 14971
- 03Software lifecycleIEC 62304 · Class B
- 04UsabilityIEC 62366-1
- 05Post-market surveillanceMDR Annex III
13485
MDR
510k
60601
What we test, how often, and what you get.
Two different things matter: every unit is verified, and every design is validated. The table separates the two.
| Test | Basis | Frequency | Evidence supplied |
|---|---|---|---|
| Optical calibration | In-house SOP, certified simulator | 100% of units | Calibration record per serial |
| 24-hour drift check | In-house SOP | 100% of units | Drift log per lot |
| Functional / ATP | In-house test procedure | 100% of units | Test record per serial |
| Drop test | IEC 60068-2-31, ISTA 1A | Per lot sample | Test report |
| Electrical safety | IEC 60601-1 | Per model | Third-party test report |
| EMC | IEC 60601-1-2 | Per model, annual review | Third-party test report |
| SpO₂ performance | ISO 80601-2-61 | Per model | Performance test report |
| Biocompatibility | ISO 10993-5 / -10 | Per material change | Assessment report |
| Software | IEC 62304, Class B | Per release | V&V file |
| Shelf life | ASTM F1980 accelerated | Per model | Stability report |
In-house records are available on request; third-party reports are shared under NDA. We do not publish full technical files on the open web.
What it takes to list in your market.
Indicative routes for a Class IIa / Class II oximeter. Timelines run from a complete technical file, not from a purchase order — and they depend on the notified body or local agent, not on us.
| Market | Route | What we supply | Typical timeline |
|---|---|---|---|
| EU / EEA | CE MDR 2017/745, Class IIa | Technical file, DoC, EUDAMED data, IFU | 6–9 months (notified body) |
| United States | FDA 510(k) | 510(k) summary, predicate comparison, labelling | 3–6 months |
| United Kingdom | UKCA / MHRA registration | Technical file, DoC, UK responsible person details | 3–6 months |
| Brazil | ANVISA registration | Technical file, INMETRO evidence where applicable | 6–12 months |
| Saudi Arabia | SFDA MDMA | Technical file, Arabic labelling, GHTF summary | 3–6 months |
| Japan | PMDA, Class II | Technical file, DIC, Japanese IFU | 6–9 months |
| Australia | TGA, Class IIa | Technical file, sponsor details, ARTG application | 3–5 months |
Traceability from photodiode batch to shipping carton.
Every unit carries a serial number tied to its calibration record, its lot and the component batches used. If a batch issue appears in the field, we can scope it in hours, not weeks.
Incoming inspection
Optical components are inspected on arrival for wavelength and output consistency. Rejected batches are returned, not re-graded.
In-process control
Each assembly station has a defined check and a signed traveller. Units cannot move to the next station without it.
Final release
Calibration, functional test and a 24-hour drift check, followed by AQL 1.0 sampling on the finished lot and a certificate of analysis.
After shipment
Field returns are logged, analysed and reported quarterly with root-cause notes and corrective actions for contracted partners.
Ask for the pack your auditor will ask for.
Tell us the market and the model. We will send the applicable certificates, test reports and declarations under NDA — usually within one business day.